top of page
LOGOS.png
IMG_4774_edited.jpg

DCDE II

60 MW MEGACENTER, 13.8kV - 35.5kV

​

  • 150,000 SF Hardened Facility Plan

  • High Density / Medium Voltage Facility

  • 20 MW, 40 MW, 60 MW RAMP IN BUILD

  • 13.8kV and 34.5kV Distribution to LOAD

  • Chilled Water Plant for In Rack CDU Cooling

  • Blackwell NVL 72 Rack Design - Flexible

  • Fiber Connectivity - Local / Long Haul Connect

  • Project Sale or Lease 

  • Design, Construction 18 month

  • 5MW Immediate deployment options

  • 100kW Per Rack Design / 300kW Per Rack Design

IMG_4774_edited.jpg

DCDE I 

5MW FLEX CENTER

​

  • Existing Hardened 80,000 SF Facility 

  • 4 MW Immediate Availability 

  • 480 V Distribution 

  • Blackwell NVL 72 Rack Design - Flexible

  • Fiber Connectivity - Local / Long Haul Connect

  • Project For Lease 

  • Design, Construction 8-12 month

  • 5MW Immediate deployment options

  • 100kW Per Rack Design / 300kW Per Rack Design

What do I get with DCDE?

MODULE.png
MODULE.png
MODULE.png

24/7, 365 Onsite Security

Hot Air Containment

18 Megawatts Initially Allocated

N+1 and 2N UPS Distribution

Carrier Neutral, Teir III Facility

MODULE.png
MODULE.png

Roof Rights

bottom of page